← All territories
Territory 06 · Yard + DC orchestration scale-up

Territory · Substrate signal

06Network sequencing across 45 DCs.

One European yard (Tessenderlo, Belgium, 65,000 m², 180 trucks/day) on Peripass — deliberately standalone, no TMS / WMS / ERP integration. The orchestration layer above the rest of the 45-DC network is wide-open white space.

Network-level sequencing above local yard.

Customers · retailer scorecards · dealer dispatch
CADDIE · network sequencing · capacity rebalancing · audit trail
DC ops (45 sites)
Peripass · Tessenderlo
Manhattan / BY WMS
Local yard / dock systems

Yard tools solve the gate locally. Caddie ties yard + dock + dispatch + capacity together with full upstream and downstream context.

The Tessenderlo precedent · the unfilled rest.

Tessenderlo · standalone

Peripass live since June 2022 — 65,000 m², 180 trucks/day. "No integration to TMS, WMS, or ERP." Solves the local yard surface; doesn't reach upstream / downstream.

Peripass · SBD case

Network footprint

~120 factories worldwide + 45 DCs delivering ~85,000 SKUs across Tools + Outdoor + Industrial. Cross-network orchestration surface is unowned at the platform layer.

Industry coverage / SBD operations

Manufactory 4.0 · plant-side

Hartford, Connecticut center shipping connected-factory + flexible-automation + advanced-analytics to plants. Plant-side investment named; cross-network DC + yard orchestration is not.

New Equipment Digest

Three surfaces · one network.

Yard + DC sequencing

Trailer-arrival + dock-allocation + outbound dispatch · drafted with inbound delivery estimate + customer scorecard + capacity in one decision.

Multimodal vanning + 3D load building

Outbound load mix optimized against bulky-SKU constraints, retailer dock-windows, dealer-allocation fairness rules.

Cross-DC capacity rebalancing

When one DC throttles (labor, dock, weather) and another has slack, Caddie drafts the rebalancing action across affected purchase orders with audit trail.

Where we've shipped this shape.

Multi-DC

Fleet + yard + dispatch sequencing in production · a tier-1 industrial-equipment manufacturer

Road + rail

Multimodal dispatch on finished-vehicle outbound · a tier-1 commercial vehicle manufacturer

~100K trucks/day

Under orchestration across the deployment base

Questions, fence, timeline.

  1. Tessenderlo Peripass was deliberately standalone — does that logic still hold across the rest of the 45-DC network?
  2. When a DC throttles unexpectedly, how is cross-DC capacity rebalancing decided today — planner level, BU level, or after-the-fact in chargebacks?
  3. Is there a network-level dispatch-sequencing layer above individual DC operations, or does each DC sequence locally?

We'd touch

  • Yard + DC sequencing with full upstream/downstream context
  • Outbound load mix for bulky SKUs against constraints
  • Cross-DC capacity rebalancing on throttle inputs
  • Network-level dispatch orchestration above individual DCs

We wouldn't

  • Local yard / gate management at Peripass sites
  • WMS replacement at any DC
  • Dock-door physical operations
  • Plant-side Manufactory 4.0
10-12 weeks · one Outdoor + one Tools DC pair

First lane: one Outdoor DC + one Tools DC instrumented for cross-network sequencing, with 90 days of historical operations data for the throttle / rebalance pattern.

← Previous05 · The tactically-overwhelmed buyer All territories
Who's building this

Enmovil · the technology thought partner for autonomous supply chains.

One AI-native platform. Demand sensing, inventory, dispatch, execution, freight settlement, sustainability reporting. All on one intelligence layer that sits above the systems you already own.

Under orchestration
~100K
Trucks per day across the deployment base
Daily delivery accuracy
99%
Road, rail, ocean, air
Forecast accuracy
97%
Demand sensing across deployments
Logistics cost savings
8 to 15%
Measured across deployments
Integration
3 to 4wks
On existing SAP, Oracle, transportation and warehouse systems. No migration.
Deployed at
Dispatch Planning
Multimodal Logistics
Multimodal Orchestration
Dispatch Planning
Fleet Management
Logistics Orchestration
Logistics Resilience
Inventory Management
Freight Settlement
Dispatch Planning
Transport Management
Export Planning
Runs under GDPR and SOC 2. Data ingestion via API, EDI, or bulk upload. Enterprise SSO. Deploys over existing SAP ECC 6.0 and above.